Window and door schedule for builders, landlords and renovations
Number every opening, record the important details, and send one clear schedule instead of a chain of separate messages.
For a renovation, extension or rental-property project, it is easy to confuse rooms, opening sizes, colours and hardware when several windows or doors are being discussed. A simple window and door schedule gives the supplier and any installer a common starting point for checking the job.
Make one row for each opening
| Ref | Location | Approx. width × height | Product and notes |
|---|---|---|---|
| W1 | Kitchen | 1200 × 1050 mm | Casement; top opener; ask about vents |
| W2 | Bedroom | 1100 × 1200 mm | Casement; check escape opening |
| D1 | Rear entrance | 900 × 2100 mm | External door; threshold/access and lock choice |
The dimensions above are fictional examples only, not available stock sizes, fitting allowances or quotations.
Record these details before contacting any supplier
- Project: site postcode, renovation or replacement, likely access dates and whether rooms are occupied
- Each opening: unique ref (W1, W2, D1), room, floor, approximate width and height in mm, photos and rough opening style
- Appearance: uPVC or another material, outside and inside frame colours, pane divisions, handle and glass preference
- Practical constraints: restricted access, bay/window shape, ventilation, safety glazing, fire-escape function, heritage/listed status or leaseholder permission
- Service required: product-only pricing, a separate fitting quote or a repair assessment, only where available for the postcode and job
For safe measuring, use our measuring guide. Never climb a ladder or lean out to take a preliminary dimension; mark an unknown size for professional survey.
How to avoid delays or changed quotes
- Use the same opening references in every message and photograph.
- Mark every measurement as preliminary until checked by a surveyor or supplier.
- Separate product and fitting costs, VAT, delivery, waste disposal, access equipment, making good and certification.
- Ask who is responsible for building-control notifications and evidence; the answer depends on the UK nation, the property and the installer.
- Before ordering, confirm specifications, manufacturing dimensions, lead time, payment milestones and who handles damaged items or changes.
- Keep a final approved schedule and written quotation for every property; do not reuse a previous property’s specification without checking it.
One property or several?
If you manage multiple properties, create one schedule per address and an optional summary sheet for quantities. This helps avoid delivering a wrong-size unit to the wrong property. Do not send tenant contact information unless it is genuinely needed for an agreed visit and appropriate privacy information has been provided.
How guarantees and installer responsibilities should be recorded
Confirm the legal manufacturer and its written product guarantee for each line item. Also identify which business supplies, surveys and fits, the workmanship/repair warranty (if any), and the applicable certification or building-control route. Veltrix’s stated 10-year new-product cover is manufacturer-provided and not automatically a 10-year installation guarantee; no Veltrix insurance-backed guarantee policy is currently in place. See product guarantee and aftercare and the Building Regulations guide.
Send a structured project enquiry
The Veltrix quote builder can help you prepare a numbered set of approximate windows and doors and a PDF for your own records. Enquiries can be reviewed for the requested specification and postcode; do not assume trade accounts, wholesale pricing, installation in every location, guaranteed stock or a booked survey. For letting and property-management needs, see landlords and commercial enquiries.